The makeshift handrail soldering 'jig':
The completed test piece:
One of the brake van sides, with moulded handrails removed and new straight-down stanchions added. The new higher top edge of the steel sheeting still needs to be scribed on:
Verandah sides with moulded handrails removed:
All the main parts of the kit laid out, with most of the preparation work done:
No comments:
Post a Comment